Huttonville West Bridge #2 under construction in Brampton

New bridge over Huttonville Creek in Brampton. Scope includes abutments, wingwalls, bearings, diaphragms, the deck with overhang brackets, sidewalks and centre median, parapets and coping, waterproofing, approach and sleeper slabs, and expansion joints. The 400 m³ deck was placed in a single continuous pour, run west to east with staged retarder dosing so the full deck stayed workable through finishing. Work in and around the creek is carried out under regional and conservation authority permits, with crews trained in Redside Dace habitat protection. Bridge completion is targeted for late 2026.

Project Details
TypeNew Bridge Construction
StructurePrecast Girder Bridge
LocationBrampton, ON
StatusOngoing
Year2025-2026